Service

Floor Screeding

Floor screeding across Surrey done properly: traditional sand and cement or pumped liquid screed, laser-levelled, laid to tolerance over underfloor heating, and moisture-tested before your flooring goes anywhere near it.

SP

By the Surrey Plasterers team

Plastering & rendering specialists · West Molesey, KT8

·Updated ·5 min read·Floor Screeding

A screed is the layer everything else depends on. The tiles, the engineered oak, the underfloor heating performance — all of it rides on 65 millimetres of material nobody will ever see again. Get it flat, dense and dry and the floor above lasts decades; get it wrong and you find out through cracked tiles, cupped boards and a flooring fitter refusing to start. We've screeded extensions, kitchen-diners and new-builds across Surrey since 2010: right material, right depth, right drying time, proven with a meter rather than a guess.

We lay both main types. Traditional sand and cement — compacted and ruled off at typically 65–75 millimetres — remains the versatile workhorse: it takes falls for wet rooms, tolerates damp environments and suits phased work. Liquid anhydrite (calcium sulphate) screed pumps in fast, finds its own level, and flows tight around underfloor heating pipes at a thinner depth. Each has real strengths and real limits, and we'll tell you which your job wants rather than which suits us.

The unglamorous parts are where screeds are won: day joints planned, perimeter and movement joints in the right places, laitance sanded off anhydrite before tiling, and drying tracked honestly — roughly a millimetre a day for the first 40 millimetres of sand and cement, slower after that, verified with a hygrometer before any sensitive covering goes down.

Sand & cement or liquid screed: which does your floor need?

Sand and cement screed suits wet rooms, falls, phased jobs and budgets — a robust hand-laid screed at 65–75 millimetres. Liquid anhydrite screed suits speed, large open areas and underfloor heating, flowing thinner and tighter around pipes. Neither is universally better; the room, the programme and the floor covering decide.

Sand and cement is the one to choose when the floor needs to do something: fall to a drain in a wet room, step between zones, or go down area by area as a renovation allows — and it shrugs off damp conditions, where calcium sulphate screeds need careful detailing and tanking. Liquid screed earns its premium on open-plan ground floors: pumped in a morning, self-levelled to an excellent surface, and wrapped tight around every underfloor heating pipe without the voids hand compaction can leave. The trade-offs are honest ones — higher cost, no falls, and laitance to sand off before tiling. We'll price both where both are viable.

What does floor screeding cost per m² in 2026?

In 2026, traditional sand and cement screed costs around £18–£28 per square metre laid in Surrey, and liquid anhydrite screed around £25–£40 per square metre pumped and levelled. Latex self-levelling compound for sub-5mm corrections over an existing sound floor runs cheaper still, priced by bag coverage and prep.

What moves the number: depth beyond the standard build-up, access (a pump needs somewhere to park; barrowed sand and cement costs labour), insulation and membrane layers below the screed, and job size — small areas carry minimum charges. Perimeter strips, day joints and movement joints are included in our price, not surprises on the invoice. For developers we price measured per square metre across plots and phases, the same way we handle commercial plastering packages; for a homeowner's extension we quote fixed from a site visit, with the drying programme written in so your flooring dates are real ones.

How long does screed take to dry before flooring?

Sand and cement screed dries at roughly one millimetre per day for the first 40 millimetres, then noticeably slower — so a standard 65–75mm screed realistically needs two to three months to be ready for sensitive coverings. Tiles can often go down sooner; wood and vinyl must wait for a passed moisture test.

That timetable is the most common source of programme pain on extensions. Drying can't be rushed with blasted heat — forced drying cracks and curls a young screed — but steady ventilation, background warmth and early sanding of a liquid screed's laitance all genuinely help. Before wood, vinyl or any moisture-sensitive floor goes down we test rather than estimate: a surface hygrometer reading below 75% relative humidity is the benchmark the flooring trades work to. Where an old solid floor shows persistent moisture from below, the fix sits under the screed — a proper membrane detailed in with the damp-proofing and replastering work at the wall junctions.

Screeding over underfloor heating: what matters

Over underfloor heating, the screed must wrap every pipe without voids, cover them at the right depth, and be commissioned gently — a gradual temperature ramp over days, done before the final floor goes down, never after. Liquid anhydrite screed is often the best choice here: it flows around pipes and runs thinner, so the floor responds faster.

Voids are the enemy — an air pocket against a pipe insulates exactly where you want conduction — which is why pumped liquid screed has become the default over dense pipe layouts, and why thinner cover means a room that warms sooner and runs at gentler temperatures. Commissioning is the step that protects everything: the first warm-up must be staged in small daily increments up to working temperature and back down, relieving stresses before the floor finish locks the surface in. We coordinate that ramp with your installer and won't sign the floor off for covering until it's done.

How flat is flat? Levels, tolerances and falls

A good screed should sit within a few millimetres under a two-metre straightedge — the flatness class the flooring trades expect for tiles, boards and vinyl. We work to laser levels and check as we go, because flatness is laid in, not sanded on afterwards. Falls, where needed, are designed and formed deliberately.

Flatness matters more as finishes get less forgiving: large-format tiles telegraph every hollow, wide engineered boards rock on high spots, vinyl shows a trowel mark through its whole life. Where an existing slab is sound but wavy, a latex self-levelling pass at up to 5 millimetres is often the economical fix rather than a full re-screed. Levels also have to agree with everything around them — thresholds, stair bottoms, kitchen plinths and the plasterboard line — so we like screeding sequenced properly with the dry lining and boarding, setting datums from the finished floor level backwards.

What’s included

  • Sand & cement and liquid screeds
  • Underfloor heating specialists
  • Laser-levelled to tolerance
  • Moisture-tested before handover

When you need this

  • You're building an extension or kitchen-diner and need the floor screeded flat and on programme over underfloor heating
  • Your flooring fitter has refused to lay over the existing slab — too wavy, too damp, or both
  • You've had underfloor heating pipes laid and need a screed and commissioning ramp done right
  • You're a builder or developer who needs plots and phases screeded to tolerance with measured-rate pricing
  • You're renovating around Esher, Cobham or Weybridge and want screed, drying times and flooring dates coordinated by one firm

How it works

  1. 1. Site visit and datum check

    We measure existing levels with a laser, agree the finished floor level against doors, stairs and thresholds, and check the base for moisture and soundness.

  2. 2. Specification and fixed quote

    Screed type, depth, insulation and membrane build-up, joints and the honest drying programme — written down, priced fixed, with flooring-ready dates you can book against.

  3. 3. Preparation

    Base cleaned or primed, membranes lapped and taped, insulation laid tight, perimeter strip fixed, and underfloor heating pipes pressure-checked with the installer before anything covers them.

  4. 4. The pour or the lay

    Liquid screed pumped, levelled and dappled in a single visit — or sand and cement mixed, compacted and ruled to the lasers, bay by bay with day joints where we planned them.

  5. 5. Curing and drying

    Protected from traffic and draughts in the early days, laitance sanded off anhydrite screeds, ventilation managed, and drying tracked against the programme rather than hoped about.

  6. 6. Test, commission, hand over

    Hygrometer readings below 75% RH for sensitive coverings, the underfloor heating ramped gradually and signed off, and flatness demonstrated under a straightedge before your flooring arrives.

Floor Screeding prices in Surrey — from

Indicative starting prices including VAT. The exact price depends on the property, system and parts — call for a firm, fixed quote.

  • Sand & cement screed, per m²

    From £18

    Laid at 65–75mm — the 2026 range runs roughly £18–£28 per m² depending on depth and access

  • Liquid anhydrite screed, per m²

    From £25

    Pumped and self-levelled, typically £25–£40 per m² — the underfloor heating favourite

  • Latex self-levelling compound, per room

    From £240

    Sub-5mm corrections over a sound base — often all a wavy old slab needs

  • Extension / kitchen-diner package

    From £850

    Typical single-room extension screeded, cured and moisture-tested, fixed price from a site visit

  • Developer plots, measured rate

    From £17

    Per m² across phases with valuation-friendly invoicing — talk to us about the programme

Surrey Plasterers vs the alternatives

Honest comparison against general builders and the national franchises. Pick what works for you — but pick with the facts.

CriteriaSurrey PlasterersBuilder / franchise
Material choiceSand & cement or liquid, chosen for the room and the coveringGeneral builders: whatever the labourer can mix that day
Drying honestyMillimetre-per-day reality and a hygrometer test in writing"It'll be fine by Friday" — then your oak floor cups
Underfloor heatingPipes pressure-checked, voids avoided, gradual commissioning rampScreed dumped over unpressurised pipes, first heat at full blast
FlatnessLaser levels and a straightedge check before we leaveRuled off by eye; the tiler finds the hollows later
ProgrammeFlooring-ready dates in the quote, coordinated with your fittersNational screed outfits: pumped and gone, drying is your problem

In Surrey

Local picture

Screeding around here follows the building work. The extension and kitchen-diner boom across Esher, Cobham, Weybridge and Walton keeps us pouring open-plan ground floors over underfloor heating — liquid screed territory, programmed tight between the shell going up and the kitchen arriving. Around Woking, developer sites bring phased plots at measured rates plus the occasional rescue where an earlier screed failed its moisture test. And in the Victorian stock of Surbiton, Kingston and Thames Ditton we level a lot of tired solid floors with latex compounds ahead of new flooring. We're based in West Molesey, so the return visit for the moisture test is five minutes' thought, not a diary negotiation.

FAQ

Floor Screeding — your questions, answered

How soon can I walk on a new screed?+
Light foot traffic is usually fine after 24–48 hours on both screed types — we'll confirm for your mix and the weather. That's walking, not working: no point loads, no scaffold towers, no pallets of tiles for the first week. Follow-on trades can typically work off it after about a week with protection down. Full drying for floor coverings is a separate, much longer question, and we put both dates in the quote.
Why can't I tile straight onto liquid screed?+
Because anhydrite screeds form laitance — a weak, powdery surface layer as they cure — and tile adhesive bonded to laitance is bonded to nothing. The surface needs sanding off about a week after the pour, and tiling needs a gypsum-compatible primer and adhesive, because standard cement adhesives react badly with calcium sulphate. It's all routine when planned — we sand, test and confirm compatibility as part of the job.
Can you screed over existing tiles or an old concrete slab?+
Often, yes. A sound, well-bonded old slab or tiled floor can take a bonded screed or a latex self-levelling compound after proper preparation and priming — that's the economical route when levels allow. If the existing floor is friable, hollow or contaminated, or if you need insulation and underfloor heating in the build-up, it comes up and we start from a clean base. We check adhesion and levels at the site visit before pricing either way.
How thick does a floor screed need to be?+
A traditional sand and cement screed typically wants 65–75mm when laid over insulation, as in most modern floor build-ups — thinner than that and an unbonded screed becomes fragile. Liquid anhydrite can go significantly thinner, which is one reason it suits underfloor heating and refurbishments where every millimetre of height matters. Bonded screeds over a sound slab can be thinner again, and sub-5mm corrections are latex compound territory. We design the depth from your finished floor level backwards.
When can the underfloor heating be turned on?+
Not until the screed has had its initial cure — at least a week for liquid screeds, longer for sand and cement — and then only as a staged commissioning ramp: small temperature steps up to working level and back down. This must happen before the final floor covering goes down, to drive out residual moisture and relieve stresses while the surface is still free. First heat at full blast under new flooring is the classic way to wreck both at once.
Do you do small jobs — one room, a hallway, a bathroom floor?+
Yes. Single rooms, hallways, bathroom floors with falls to a drain, and latex levelling passes ahead of a flooring fitter are everyday work for us, priced with an honest minimum charge because the setup and clean-down are the same as a bigger job. We slot small screeds between larger pours, which keeps the price sensible, and being based in West Molesey means the follow-up moisture test doesn't carry a call-out drama.
What goes under the screed — insulation, membranes, edge strip?+
A modern floor build-up is layered: damp-proof membrane over the slab, rigid insulation laid tight and taped, perimeter edge strip to isolate the screed from the walls, then the screed itself with movement joints across long runs and doorways. A missing edge strip or a gappy insulation layer shows up later as cracking or cold spots. We install the full build-up or work over a builder's prepared base — but we check it before we pour, because our name goes on the floor.